Ignispin's installation teams carry out the physical execution of every system we design — equipment installation, piping and cable network installation, and panel and device fixing — followed by a structured testing and commissioning process before any system is handed over. Systems are not considered complete once equipment is fitted; each is functionally tested, inspected, and commissioned according to the applicable system requirements and project specifications, with the results documented for the client's records and for fire NOC submission where required.
Material and equipment supply, site preparation, and installation of hydrant and sprinkler piping networks, fire alarm and detection cabling, gas suppression piping, CCTV and PA system wiring, with cabling and termination carried out to specification.
Physical and control-level integration between fire alarm, suppression, detection, CCTV and voice evacuation systems installed as part of the same project.
Functional testing of every installed system — hydrostatic/pressure testing for piping networks where applicable, cause & effect testing, and alarm testing — before commissioning.
Formal commissioning against design parameters, client demonstration and training on the installed systems, complete documentation, and a structured handover.
Scope, process, and how this service fits with the rest of your fire protection project.
Yes — every system Ignispin installs is functionally tested and formally commissioned before handover, according to the applicable system requirements and project specifications; this is a standard part of our installation scope, not a separate service.
Clients receive test reports, as-built documentation, and commissioning records for the installed systems, along with a client demonstration and training on system operation, which also support fire NOC submission where applicable.
In some cases, yes — our team can review the existing installation and carry out testing and commissioning work, subject to a site assessment. Contact us with the project details.